M. A. Aloulou, A. Dolgui, and M. Y. Kovalyov, A bibliography of non-deterministic lot-sizing models, International Journal of Production Research, vol.52, issue.8, pp.2293-2310, 2014.
URL : https://hal.archives-ouvertes.fr/emse-00881465

O. Ben-ammar, A. Dolgui, and D. D. Wu, Planned lead times optimization for multi-level assembly systems under uncertainties, Omega, vol.78, pp.39-56, 2018.
URL : https://hal.archives-ouvertes.fr/hal-01769391

O. Ben-ammar, B. Bettayeb, and A. Dolgui, Supply planning optimization for linear production system with stochastic lead-times and quality control, International Conference on Industrial Engineering and Systems Management (IESM 2017, 2017.
URL : https://hal.archives-ouvertes.fr/hal-01627085

O. Ben-ammar, H. Marian, A. Dolgui, and D. D. Wu, Reducing the research space of possible order release dates for multi-level assembly systems under stochastic lead times, IFIP International Conference on Advances in Production Management Systems, pp.368-374, 2014.
URL : https://hal.archives-ouvertes.fr/emse-01061104

B. Bettayeb, S. J. Bassetto, and M. Sahnoun, Quality control planning to prevent excessive scrap production, Journal of Manufacturing Systems, vol.33, issue.3, pp.400-411, 2014.

B. Bettayeb, N. Brahimi, and D. Lemoine, Integrated dynamic single item lot-sizing and quality inspection planning, International Journal of Production Research, pp.1-17, 2017.
URL : https://hal.archives-ouvertes.fr/hal-01689377

J. A. Buzacott and J. G. Shanthikumar, Safety stock versus safety time in MRP controlled production systems, Management science, vol.40, issue.12, pp.1678-1689, 1994.

M. Colledani and T. T. , Impact of Quality Control on Production System Performance, CIRP Annals -Manufacturing Technology, vol.55, issue.1, pp.453-456, 2006.

M. Díaz-madroñero, J. Mula, and D. Peidro, A review of discrete-time optimization models for tactical production planning, International Journal of Production Research, vol.52, issue.17, pp.5171-5205, 2014.

H. Ding, L. Benyoucef, and X. Xie, A simulation optimization methodology for supplier selection problem, International Journal of Computer Integrated Manufacturing, vol.18, issue.2-3, pp.210-224, 2005.
URL : https://hal.archives-ouvertes.fr/emse-00449389

A. Dolgui, O. Ben-ammar, F. Hnaien, and M. A. Louly, A state of the art on supply planning and inventory control under lead time uncertainty, Studies in Informatics and Control, vol.22, issue.3, pp.255-268, 2013.
URL : https://hal.archives-ouvertes.fr/emse-00877836

A. Dolgui, G. Levin, and M. A. Louly, Decomposition approach for a problem of lot-sizing and sequencing under uncertainties, International Journal of Computer Integrated Manufacturing, vol.18, issue.5, pp.376-385, 2005.
URL : https://hal.archives-ouvertes.fr/hal-00387627

A. Dolgui and C. Prodhon, Supply planning under uncertainties in MRP environments: A state of the art, Annual Reviews in Control, vol.31, issue.2, pp.269-279, 2007.
URL : https://hal.archives-ouvertes.fr/emse-00675845

M. Elhafsi, Optimal leadtimes planning in serial production systems with earliness and tardiness costs, IIE transactions, vol.34, issue.3, pp.233-243, 2002.

L. Gong, T. Kok, and J. Ding, Optimal leadtimes planning in a serial production system, Management Science, vol.40, issue.5, pp.629-632, 1994.

V. R. Guide and R. Srivastava, A review of techniques for buffering against uncertainty with MRP systems, Production Planning & Control, vol.11, issue.3, pp.223-233, 2000.

S. Jansen, Z. Atan, I. Adan, and T. De-kok, Setting optimal planned leadtimes in configure-to-order assembly systems, European Journal of Operational Research, 2018.

J. G. Kim, D. Chatfield, T. P. Harrison, and J. C. Hayya, Quantifying the bullwhip effect in a supply chain with stochastic lead time, European Journal of operational research, vol.173, issue.2, pp.617-636, 2006.

J. G. Kim, D. Sun, X. J. He, and J. C. Hayya, The (s, Q) inventory model with Erlang lead time and deterministic demand, Naval Research Logistics (NRL), vol.51, issue.6, pp.906-923, 2004.

H. Kuang, S. J. Hu, and J. Ko, A dynamic programming approach to integrated assembly planning and supplier assignment with lead time constraints, International Journal of Production Research, vol.54, issue.9, pp.2691-2708, 2016.

H. Matsuura and H. Tsubone, Setting planned leadtimes in capacity requirements planning, Journal of the Operational Research Society, vol.44, issue.8, pp.809-816, 1993.

H. Matsuura, H. Tsubone, and M. Kanezashi, Setting planned lead times for multi-operation jobs, European journal of operational research, vol.88, issue.2, pp.287-303, 1996.

B. I. May, M. P. Atkinson, and G. Ferrer, Applying inventory classification to a large inventory management system, Journal of Operations and Supply Chain Management, vol.10, issue.1, pp.68-86, 2017.

D. Petrovic, R. Roy, and R. Petrovic, Modelling and simulation of a supply chain in an uncertain environment, European journal of operational research, vol.109, issue.2, pp.299-309, 1998.

M. J. Rosenblatt and H. L. Lee, Economic Production Cycles with Imperfect Production Processes, IIE Transactions, vol.18, issue.1, pp.48-55, 1986.

K. Schemeleva, X. Delorme, and A. Dolgui, Evaluation of solution approaches for a stochastic lot-sizing and sequencing problem, International Journal of Production Economics, vol.199, pp.179-192, 2018.
URL : https://hal.archives-ouvertes.fr/hal-01734617

E. Simangunsong, L. C. Hendry, and M. Stevenson, Supply-chain uncertainty: a review and theoretical foundation for future research, International Journal of Production Research, vol.50, issue.16, pp.4493-4523, 2012.
URL : https://hal.archives-ouvertes.fr/hal-00740351

C. S. Tang, The Impact of Uncertainty on a Production Line, Management Science, vol.36, issue.12, pp.1518-1531, 1990.

J. G. Van-der-vorst and A. J. Beulens, Identifying sources of uncertainty to generate supply chain redesign strategies, International Journal of Physical Distribution & Logistics Management, vol.32, issue.6, pp.409-430, 2002.

J. K. Weeks, Optimizing planned lead times and delivery dates, 21st Annual Conference Proceeding, pp.177-188, 1981.

D. C. Whybark and J. G. Williams, Material requirements planning under uncertainty, Decision sciences, vol.7, issue.4, pp.595-606, 1976.

C. A. Yano, Setting planned leadtimes in serial production systems with tardiness costs, Management science, vol.33, issue.1, pp.95-106, 1987.

C. A. Yano, Planned leadtimes for serial production systems, IIE transactions, vol.19, issue.3, pp.300-307, 1987.